Charts are available for various changing data points. These can be accessed from the graphics page of Operator, by clicking on the data point. A sidebar opens on the right of the screen, showing a chart of the data for the last 3 days.
Adding data points
You can add additional data points to the same chart to see how different values correlate.
- Click on the pencil symbol in the upper right-hand corner of the sidebar. More information then appears underneath the chart.
- Click on + Add data point. This opens a new window showing the project graphics.
- There are two ways to add another data point:
- Find the data point in the graphics and click on it, or:
- At the top left of the window, click on the List tab. This will display a list of all of the project data points available for charts. Click on the box to the left of the data point(s) you want to add to the chart and then in the bottom right corner, click the Add button.The chart in the right sidebar now includes any added data points.
| Note: not every data point is suitable for charts. If the charts don't change after adding additional data points, it may be that the points added are not suitable for (some) charts. Status data points are generally not suitable for charts, for example. |